ST FRANCIS ENERGY FACILITY

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
345
kV

ST FRANCIS ENERGY FACILITY is an electric transmission substation in Missouri, operated by UNION ELECTRIC CO - (MO). It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage161 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

OperatorUNION ELECTRIC CO - (MO)
Coordinates36.5509, -90.1664

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16345 kVIN SERVICE4.6 mi
#42091345 kVUNION ELECTRIC CO - (MO)IN SERVICE4.4 mi
#5516161 kVUNION ELECTRIC CO - (MO)0.1 mi
#20041161 kVUNION ELECTRIC CO - (MO)IN SERVICE9.9 mi
#20399161 kVUNION ELECTRIC CO - (MO)IN SERVICE23.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ST FRANCIS ENERGY FACILITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ST FRANCIS ENERGY FACILITY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ESSEXSubstation-AdjacentMOStoddard County345 kV600 MW1.4 yrs70.3
TAP154705Substation-AdjacentMOButler County345 kV600 MW1.4 yrs70.3
UNKNOWN122781Substation-AdjacentMOButler County345 kV600 MW4.6 yrs70.0
TAP154742Substation-AdjacentMONew Madrid County345 kV600 MW1.4 yrs68.4
UNKNOWN122826Substation-AdjacentMOButler County161 kV100 MW1.4 yrs65.2
Greenfield (WEST NEW MADRID - DELL)GreenfieldMOPemiscot County500 kV1,000 MW1.4 yrs64.7
UNKNOWN121102Substation-AdjacentMODunklin County161 kV100 MW1.4 yrs64.7
ST FRANCIS ENERGY FACILITYSubstation-AdjacentMOButler County345 kV600 MW1.4 yrs64.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ST FRANCIS ENERGY FACILITY substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.