CROW RIVER

Substation

Minnesota · DELANO MUNICIPAL UTILITIES

Max voltage
115
kV

CROW RIVER is an electric transmission substation in Minnesota, operated by DELANO MUNICIPAL UTILITIES. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDELANO MUNICIPAL UTILITIES
Coordinates45.0656, -93.9051

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#24317115 kVDELANO MUNICIPAL UTILITIESIN SERVICE4.1 mi
#44602115 kVDELANO MUNICIPAL UTILITIESIN SERVICE25.2 mi
#59966115 kVIN SERVICE12.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CROW RIVER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CROW RIVER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BLUE LAKESubstation-AdjacentMNCarver County345 kV600 MW1.4 yrs79.9
DICKINSONSubstation-AdjacentMNHennepin County345 kV600 MW1.4 yrs75.2
ELK RIVERSubstation-AdjacentMNSherburne County230 kV300 MW1.4 yrs74.7
Greenfield (UNKNOWN129414 - DICKINSON)GreenfieldMNHennepin County345 kV600 MW1.4 yrs72.3
SHERBURNE COUNTYSubstation-AdjacentMNSherburne County345 kV600 MW1.4 yrs71.9
UNKNOWN170707Substation-AdjacentMNCarver County115 kV100 MW1.4 yrs71.5
SCOTT COSubstation-AdjacentMNScott County345 kV600 MW1.4 yrs71.3
UNKNOWN129735Substation-AdjacentMNCarver County230 kV300 MW1.4 yrs71.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CROW RIVER substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.