BAXTER is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorALLETE, INC.
Coordinates46.3795, -94.3187

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#59730115 kVALLETE, INC.IN SERVICE3.7 mi
#59732115 kVIN SERVICE0.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BAXTER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BAXTER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP136156Substation-AdjacentMNMorrison County230 kV300 MW1.4 yrs71.7
RIVERTON 230/115 KVSubstation-AdjacentMNCrow Wing County230 kV300 MW1.4 yrs68.2
UNKNOWN129676Substation-AdjacentMNCrow Wing County115 kV100 MW1.4 yrs67.8
BADOURA 230/115 KVSubstation-AdjacentMNWadena County230 kV300 MW1.4 yrs67.4
TAP136155Substation-AdjacentMNCrow Wing County230 kV300 MW1.4 yrs67.3
BRAINERDSubstation-AdjacentMNCrow Wing County115 kV100 MW1.4 yrs65.6
Greenfield (BLACKBERRY - RIVERTON 230/115 )GreenfieldMNCrow Wing County230 kV300 MW1.4 yrs65.6
Greenfield (BADOURA 230/115 KV - RIVERTON )GreenfieldMNCrow Wing County230 kV300 MW1.4 yrs63.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BAXTER substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.