Crow Wing County, Minnesota · MISO

DC Readiness
67.3
Good / 100

TAP136155 is a substation-adjacent datacenter candidate site in Crow Wing County, Minnesota, interconnecting through MISO. It screens at 67.3/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP136155
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDataBank Minneapolis (MSP3)
IXP distance91.1 mi
Fiber providers9
Fiber coverage66.2%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance314.3 mi

Site characteristics

Parcel ownerSprott, John C
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index92.6 (avg 100)

Location context

Nearest datacenterDataBank
DC distance91.1 mi
Nearest rail2.6 mi
Nearest gas pipeline3.4 mi
Nearest fiber route157.6 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.65¢/kWh
Industrial electricity9.94¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,187

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
57
Fiber connectivity12%
67
Energy cost10%
87
Water risk8%
90
Natural hazard8%
75
Buildability7%
15
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
73
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Crow Wing County, ranked by DC Readiness.

Sites near TAP136155
SiteTypeVoltageCapacityQueue waitScore
RIVERTON 230/115 KVSubstation-Adjacent230 kV300 MW1.4 yrs68.2
UNKNOWN129676Substation-Adjacent115 kV100 MW1.4 yrs67.8
BRAINERDSubstation-Adjacent115 kV100 MW1.4 yrs65.6
Greenfield (BLACKBERRY - RIVERTON 230/115 )Greenfield230 kV300 MW1.4 yrs65.6
Greenfield (BLACKBERRY - RIVERTON 230/115 )Greenfield230 kV300 MW1.4 yrs64.7
Greenfield (BADOURA 230/115 KV - RIVERTON )Greenfield230 kV300 MW1.4 yrs63.9
RIVERTON 115/34 KVSubstation-Adjacent115 kV100 MW1.4 yrs62.3
EC Coal Crow Wing CountyGreenfield1.4 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.