TAP139724

Substation

Massachusetts · FITCHBURG GAS AND ELECTRIC LIGHT COMPANY

Max voltage
115
kV

TAP139724 is an electric transmission substation in Massachusetts, operated by FITCHBURG GAS AND ELECTRIC LIGHT COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorFITCHBURG GAS AND ELECTRIC LIGHT COMPANY
Coordinates42.4214, -71.7499

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20531115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE0.0 mi
#29680115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE1.4 mi
#44438115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE7.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139724, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139724 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ANP BLACKSTONE ENERGY PROJECTSubstation-AdjacentRIProvidence County345 kV600 MW3.5 yrs72.9
MILLBURY NO. 3Substation-AdjacentMAWorcester County345 kV600 MW3.5 yrs72.3
UNKNOWN133682Substation-AdjacentMAMiddlesex County450 kV600 MW3.5 yrs71.8
UNKNOWN132744Substation-AdjacentNHHillsborough County345 kV600 MW3.5 yrs71.7
AMHERSTSubstation-AdjacentNHHillsborough County345 kV600 MW3.5 yrs71.3
SCOBIE POND 345KVSubstation-AdjacentNHRockingham County345 kV600 MW3.5 yrs70.8
BELLINGHAM COGENERATION FACILITYSubstation-AdjacentRIProvidence County345 kV600 MW3.5 yrs70.6
LAWRENCE ROADSubstation-AdjacentMAMiddlesex County345 kV600 MW3.5 yrs70.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139724 substation, Massachusetts. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.