SCOBIE POND 345KV

Substation-Adjacent

Rockingham County, New Hampshire · ISO-NE

DC Readiness
70.8
Excellent / 100

SCOBIE POND 345KV is a substation-adjacent datacenter candidate site in Rockingham County, New Hampshire, interconnecting through ISO-NE. It screens at 70.8/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSCOBIE POND 345KV
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
LMP zoneISONE_MA
Wholesale LMP$69.64/MWh
Utility commercial rate0.16¢/kWh

Speed to power

ISO / RTO regionISO-NE
Queue depth32
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPNavisite Andover
IXP distance9.6 mi
Fiber providers7
Fiber coverage67.8%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance411.3 mi

Site characteristics

Parcel ownerPUBLIC SERVICE CO OF NH
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund sitePELL ENGINEERING MFG INC
Hazard sub-score75/100
Construction cost index109.1 (avg 100)

Location context

Nearest datacenterNavisite Andover
DC distance9.6 mi
Nearest rail4.8 mi
Nearest gas pipeline0.7 mi
Nearest fiber route23.3 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.63¢/kWh
Industrial electricity13.26¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$17,929

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
37
Fiber connectivity12%
83
Energy cost10%
57
Water risk8%
92
Natural hazard8%
75
Buildability7%
92
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
59
Gas pipeline2%
98
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Rockingham County, ranked by DC Readiness.

Sites near SCOBIE POND 345KV
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132717Substation-Adjacent230 kV300 MW3.5 yrs73.5
SCOBIE POND 345KVSubstation-Adjacent345 kV600 MW3.5 yrs73.5
ESSENTIAL POWER NEWINGTON LLCSubstation-Adjacent345 kV600 MW3.5 yrs73.1
UNKNOWN132750Substation-Adjacent345 kV600 MW3.5 yrs71.2
TIMBER SWAMPSubstation-Adjacent345 kV600 MW3.5 yrs70.0
WATTS BROOKSubstation-Adjacent230 kV300 MW3.5 yrs69.8
UNKNOWN132750Substation-Adjacent345 kV600 MW3.5 yrs69.4
WEST AMESBURYSubstation-Adjacent345 kV600 MW3.5 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SCOBIE POND 345KV, Rockingham County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.