MEROM STATION is an electric transmission substation in Illinois, operated by DUKE ENERGY INDIANA, LLC. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorDUKE ENERGY INDIANA, LLC
Coordinates39.1527, -87.3830

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#29715345 kVDUKE ENERGY INDIANA, LLCIN SERVICE26.5 mi
#29909345 kVDUKE ENERGY INDIANA, LLCIN SERVICE28.6 mi
#34931345 kVDUKE ENERGY INDIANA, LLCIN SERVICE61.3 mi
#64279345 kVDUKE ENERGY INDIANA, LLC0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MEROM STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MEROM STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SUGAR CREEK POWERSubstation-AdjacentINVigo County345 kV600 MW4.6 yrs76.2
UNKNOWN124561Substation-AdjacentINVigo County230 kV300 MW4.6 yrs72.7
Wabash RiverBrownfieldINVigo868 MW72.2
SPENCERSubstation-AdjacentINClay County230 kV300 MW4.6 yrs71.7
SULLIVANSubstation-AdjacentINKnox County765 kV1,000 MW4.6 yrs71.7
UNKNOWN124767Substation-AdjacentINClay County230 kV300 MW4.6 yrs71.6
MEROM STATIONSubstation-AdjacentINSullivan County345 kV600 MW4.6 yrs70.6
EDWARDSPORT STATION IGCCSubstation-AdjacentINKnox County345 kV600 MW4.6 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen