UNKNOWN124561

Substation-Adjacent

VIGO, Indiana · PJM

DC Readiness
72.7
Excellent / 100

UNKNOWN124561 is a substation-adjacent datacenter candidate site in VIGO, Indiana, interconnecting through PJM. It screens at 72.7/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN124561
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPIndiana University Data Center
IXP distance55.1 mi
Fiber providers8
Fiber coverage75.3%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance162.7 mi

Site characteristics

Parcel ownerDUKE ENERGY INDIANA INC
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former useoil
Existing capacity113 MW
Retirement date2016-05-01

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteWABASH RIVER HIGHLAND PLANT
Hazard sub-score58/100
Construction cost index92.4 (avg 100)

Location context

Nearest datacenterIU Data Center
DC distance55.1 mi
Nearest rail0.4 mi
Nearest gas pipeline0.9 mi
Nearest fiber route77.3 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.99¢/kWh
Industrial electricity8.65¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,886

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
51
Fiber connectivity12%
71
Energy cost10%
93
Water risk8%
91
Natural hazard8%
58
Buildability7%
100
Labor market4%
50
DC cluster4%
45
Land / acreage3%
46
Construction cost3%
73
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in VIGO, ranked by DC Readiness.

Sites near UNKNOWN124561
SiteTypeVoltageCapacityQueue waitScore
SUGAR CREEK POWERSubstation-Adjacent345 kV600 MW4.6 yrs76.2
Wabash RiverBrownfield868 MW72.2
UNKNOWN124617Substation-Adjacent345 kV600 MW4.6 yrs71.7
UNKNOWN124449Substation-Adjacent230 kV300 MW4.6 yrs69.6
UNKNOWN124769Substation-Adjacent138 kV100 MW4.6 yrs67.8
UNKNOWN124774Substation-Adjacent138 kV100 MW4.6 yrs67.7
TAP138324Substation-Adjacent138 kV100 MW4.6 yrs66.8
UNKNOWN124443Substation-Adjacent138 kV100 MW4.6 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN124561, VIGO. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.