VIGO, Indiana · PJM

DC Readiness
66.8
Good / 100

TAP138324 is a substation-adjacent datacenter candidate site in VIGO, Indiana, interconnecting through PJM. It screens at 66.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP138324
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPIndiana University Data Center
IXP distance53.6 mi
Fiber providers8
Fiber coverage75.3%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance161.1 mi

Site characteristics

Parcel ownerDUKE ENERGY INDIANA INC
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score68/100
Construction cost index92.4 (avg 100)

Location context

Nearest datacenterIU Data Center
DC distance53.6 mi
Nearest rail1.5 mi
Nearest gas pipeline3.1 mi
Nearest fiber route74.2 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.99¢/kWh
Industrial electricity8.65¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,886

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
44
Fiber connectivity12%
70
Energy cost10%
85
Water risk8%
91
Natural hazard8%
68
Buildability7%
90
Labor market4%
50
DC cluster4%
45
Land / acreage3%
46
Construction cost3%
73
Gas pipeline2%
90
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in VIGO, ranked by DC Readiness.

Sites near TAP138324
SiteTypeVoltageCapacityQueue waitScore
SUGAR CREEK POWERSubstation-Adjacent345 kV600 MW4.6 yrs76.2
UNKNOWN124561Substation-Adjacent230 kV300 MW4.6 yrs72.7
Wabash RiverBrownfield868 MW72.2
UNKNOWN124617Substation-Adjacent345 kV600 MW4.6 yrs71.7
UNKNOWN124449Substation-Adjacent230 kV300 MW4.6 yrs69.6
UNKNOWN124769Substation-Adjacent138 kV100 MW4.6 yrs67.8
UNKNOWN124774Substation-Adjacent138 kV100 MW4.6 yrs67.7
UNKNOWN124443Substation-Adjacent138 kV100 MW4.6 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138324, VIGO. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.