BIG SHANTY

Substation

Georgia · GEORGIA POWER CO

Max voltage
500
kV

BIG SHANTY is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as extra-high-voltage (500 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines8

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates33.9835, -84.5513

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19947500 kVGEORGIA POWER COIN SERVICE11.9 mi
#23466230 kVGEORGIA POWER COIN SERVICE3.0 mi
#28793230 kVGEORGIA POWER COIN SERVICE7.7 mi
#36446230 kVGEORGIA POWER COIN SERVICE3.1 mi
#36691230 kVGEORGIA POWER COIN SERVICE3.3 mi
#41494230 kVGEORGIA POWER COIN SERVICE4.1 mi
#3314230 kVGEORGIA POWER COIN SERVICE5.6 mi
#50381230 kVGEORGIA POWER COIN SERVICE3.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BIG SHANTY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BIG SHANTY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG SHANTYSubstation-AdjacentGACobb County500 kV1,000 MW5.8 yrs79.9
VILLA RICASubstation-AdjacentGADouglas County500 kV1,000 MW5.8 yrs79.9
KLONDIKESubstation-AdjacentGARockdale County500 kV1,000 MW5.8 yrs79.8
BULL SLUICESubstation-AdjacentGACobb County500 kV1,000 MW5.8 yrs78.1
Jack McDonoughBrownfieldGAFulton598 MW77.9
UNKNOWN115644Substation-AdjacentGADouglas County230 kV300 MW5.8 yrs77.1
UNKNOWN111545Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs77.0
UNKNOWN111355Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs76.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BIG SHANTY substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.