UNKNOWN115644

Substation-Adjacent

Douglas County, Georgia · SERC

DC Readiness
77.1
Excellent / 100

UNKNOWN115644 is a substation-adjacent datacenter candidate site in Douglas County, Georgia, interconnecting through SERC. It screens at 77.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN115644
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPFlexential - Atlanta/Douglasville (ATL5)
IXP distance3.0 mi
Fiber providers9
Fiber coverage73.1%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance270.8 mi

Site characteristics

Parcel ownerGEORGIA POWER CO
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)1.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund sitePUBLIX SUPERMARKET 730 PARADISE CROSSING
Hazard sub-score50/100
Construction cost index85.0 (avg 100)

Location context

Nearest datacenterSwitch Atlanta
DC distance2.6 mi
Nearest rail3.5 mi
Nearest gas pipeline1.1 mi
Nearest fiber route29.3 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.28¢/kWh
Industrial electricity7.98¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$7,432

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
70
Fiber connectivity12%
91
Energy cost10%
89
Water risk8%
80
Natural hazard8%
50
Buildability7%
100
Labor market4%
50
DC cluster4%
100
Land / acreage3%
43
Construction cost3%
79
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
15

Nearby comparable sites

Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.

Sites near UNKNOWN115644
SiteTypeVoltageCapacityQueue waitScore
VILLA RICASubstation-Adjacent500 kV1,000 MW5.8 yrs79.9
UNKNOWN115650Substation-Adjacent230 kV300 MW5.8 yrs76.1
UNKNOWN115642Substation-Adjacent230 kV300 MW5.8 yrs75.4
Greenfield (VILLA RICA - UNION)Greenfield500 kV1,000 MW5.8 yrs74.1
VILLA RICASubstation-Adjacent500 kV1,000 MW3.7 yrs72.9
UNKNOWN173854Substation-Adjacent230 kV300 MW5.8 yrs72.7
Greenfield (BOWEN SUBSTATION - VILLA RICA)Greenfield500 kV1,000 MW3.7 yrs71.9
UNKNOWN116621Substation-Adjacent230 kV300 MW5.8 yrs71.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN115644, Douglas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.