CITY OF CLEWISTON

Substation

Florida

Max voltage
138
kV

CITY OF CLEWISTON is an electric transmission substation in Florida. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateFlorida
Coordinates26.6900, -80.9433

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18764138 kVIN SERVICE3.6 mi
#37899138 kVIN SERVICE3.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CITY OF CLEWISTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CITY OF CLEWISTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CORBETTSubstation-AdjacentFLPalm Beach County500 kV1,000 MW3.6 yrs71.1
Greenfield (MARTIN - CORBETT)GreenfieldFLMartin County500 kV1,000 MW3.6 yrs67.1
Greenfield (ANDYTOWN - ORANGE RIVER)GreenfieldFLHendry County500 kV1,000 MW3.6 yrs65.1
MartinBrownfieldFLMartin County3,623 MW3.6 yrs64.7
Greenfield (ANDYTOWN - ORANGE RIVER)GreenfieldFLBroward County500 kV1,000 MW3.6 yrs64.2
HICPOCHEESubstation-AdjacentFLHendry County138 kV100 MW3.6 yrs63.6
Greenfield (ANDYTOWN - ORANGE RIVER)GreenfieldFLBroward County500 kV1,000 MW3.6 yrs63.4
SOUTH BAYSubstation-AdjacentFLPalm Beach County138 kV100 MW3.6 yrs63.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CITY OF CLEWISTON substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.