Greenfield (ANDYTOWN - ORANGE RIVER)

Greenfield

Hendry County, Florida · SERC

DC Readiness
65.1
Good / 100

Greenfield (ANDYTOWN - ORANGE RIVER) is a greenfield datacenter candidate site in Hendry County, Florida, interconnecting through SERC. It screens at 65.1/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationANDYTOWN
Substation voltage500 kV
Available capacity1,000 MW
Utility commercial rate0.15¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPFlexential - Fort Lauderdale (FLL1/2)
IXP distance51.4 mi
Fiber providers7
Fiber coverage20.7%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance475.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerGarcia Family Farm LLC
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index76.3 (avg 100)

Location context

Nearest datacenterT-Mobile Everglades MSO Data Center
DC distance45.9 mi
Nearest rail15.6 mi
Nearest gas pipeline44.7 mi
Nearest fiber route135.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity15.01¢/kWh
Industrial electricity11.85¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$4,646

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
75
Fiber connectivity12%
45
Energy cost10%
89
Water risk8%
71
Natural hazard8%
45
Buildability7%
90
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
86
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Hendry County, ranked by DC Readiness.

Sites near Greenfield (ANDYTOWN - ORANGE RIVER)
SiteTypeVoltageCapacityQueue waitScore
HICPOCHEESubstation-Adjacent138 kV100 MW3.6 yrs63.6
Greenfield (ANDYTOWN - ORANGE RIVER)Greenfield500 kV1,000 MW3.6 yrs62.9
UNKNOWN108515Substation-Adjacent138 kV100 MW3.6 yrs62.6
Greenfield (CORBETT - ALVA)Greenfield230 kV300 MW3.6 yrs62.5
Greenfield (TAP141798 - ORANGETREE)Greenfield230 kV300 MW3.6 yrs62.4
CITY OF CLEWISTONSubstation-Adjacent138 kV100 MW3.6 yrs62.4
Greenfield (TAP141798 - ORANGETREE)Greenfield230 kV300 MW3.6 yrs62.1
UNKNOWN172422Substation-Adjacent138 kV100 MW3.6 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (ANDYTOWN - ORANGE RIVER), Hendry County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.