CENTER PARK

Substation

Florida · JEA

Max voltage
230
kV

CENTER PARK is an electric transmission substation in Florida, operated by JEA. It is classified as high-voltage (230 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines7

Ownership & operation

OperatorJEA
StateFlorida
Coordinates30.2724, -81.4980

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#42911230 kVJEAIN SERVICE11.7 mi
#26909230 kVJEAIN SERVICE2.9 mi
#50045230 kVJEAIN SERVICE3.0 mi
#43283138 kVJEAIN SERVICE2.9 mi
#40822138 kVJEAIN SERVICE4.3 mi
#25994138 kVJEAIN SERVICE11.0 mi
#9473138 kVJEAIN SERVICE5.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CENTER PARK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CENTER PARK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BARTRAMSubstation-AdjacentFLDuval County230 kV300 MW3.6 yrs75.6
SWITZERLANDSubstation-AdjacentFLClay County230 kV300 MW3.6 yrs75.2
UNKNOWN120521Substation-AdjacentFLDuval County230 kV300 MW3.6 yrs75.0
UNKNOWN120519Substation-AdjacentFLDuval County230 kV300 MW3.6 yrs74.1
UNKNOWN120554Substation-AdjacentFLDuval County230 kV300 MW5.8 yrs74.1
FORT CAROLINESubstation-AdjacentFLDuval County230 kV300 MW5.8 yrs73.5
SPRINGBANKSubstation-AdjacentFLClay County230 kV300 MW3.6 yrs73.4
TAP161532Substation-AdjacentFLDuval County230 kV300 MW3.6 yrs73.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CENTER PARK substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.