WOLCOTT

Substation

Colorado · HOLY CROSS ELECTRIC ASSN, INC

Max voltage
230
kV

WOLCOTT is an electric transmission substation in Colorado, operated by HOLY CROSS ELECTRIC ASSN, INC. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorHOLY CROSS ELECTRIC ASSN, INC
Co-ownerTRI-STATE G & T ASSN, INC
Coordinates39.6950, -106.6884

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68706230 kVTRI-STATE G & T ASSN, INC56.7 mi
#68736230 kVTRI-STATE G & T ASSN, INC14.4 mi
#72355115 kVHOLY CROSS ELECTRIC ASSN, INC10.8 mi
#72357115 kVHOLY CROSS ELECTRIC ASSN, INC11.1 mi
#78861115 kVHOLY CROSS ELECTRIC ASSN, INC9.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WOLCOTT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WOLCOTT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COOLEY MESASubstation-AdjacentCOEagle County230 kV300 MW1.7 yrs63.6
UNKNOWN209707Substation-AdjacentCOEagle County115 kV100 MW1.7 yrs59.4
AVONSubstation-AdjacentCOEagle County115 kV100 MW1.7 yrs58.2
WOLCOTTSubstation-AdjacentCOEagle County230 kV300 MW1.7 yrs57.9
Greenfield (WOLCOTT - COOLEY MESA)GreenfieldCOEagle County230 kV300 MW1.7 yrs57.2
UNKNOWN205909Substation-AdjacentCOGrand County115 kV100 MW1.7 yrs56.5
Greenfield (WOLCOTT - UNKNOWN202355)GreenfieldCOEagle County230 kV300 MW1.7 yrs56.5
GREEN MOUTAINSubstation-AdjacentCOGrand County115 kV100 MW1.7 yrs55.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.