UNKNOWN205909

Substation-Adjacent

Grand County, Colorado · WECC

DC Readiness
56.5
Good / 100

UNKNOWN205909 is a substation-adjacent datacenter candidate site in Grand County, Colorado, interconnecting through WECC. It screens at 56.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN205909
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPBLDR-1919
IXP distance54.2 mi
Fiber providers3
Fiber coverage2.2%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance298.2 mi

Site characteristics

Parcel ownerUnited States Of America
Parcel APN144113400051
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone D
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index89.0 (avg 100)

Location context

Nearest datacenterBLDR-1919
DC distance54.2 mi
Nearest rail0.9 mi
Nearest gas pipeline33.2 mi
Nearest fiber route60.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.22¢/kWh
Industrial electricity8.20¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,754

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
33
Fiber connectivity12%
50
Energy cost10%
89
Water risk8%
49
Natural hazard8%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
76
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Grand County, ranked by DC Readiness.

Sites near UNKNOWN205909
SiteTypeVoltageCapacityQueue waitScore
GORE PASSSubstation-Adjacent230 kV300 MW1.7 yrs61.9
FRASERSubstation-Adjacent138 kV100 MW1.7 yrs60.9
BLUE RIVERSubstation-Adjacent230 kV300 MW1.7 yrs58.9
UNKNOWN209003Substation-Adjacent138 kV100 MW1.7 yrs56.3
GREEN MOUTAINSubstation-Adjacent115 kV100 MW1.7 yrs55.9
Greenfield (BLUE RIVER - GORE PASS)Greenfield230 kV300 MW1.7 yrs55.5
Greenfield (BLUE RIVER - GORE PASS)Greenfield230 kV300 MW1.7 yrs54.9
Greenfield (GORE PASS - HAYDEN)Greenfield230 kV300 MW1.7 yrs53.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN205909, Grand County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.