WINDY GAP

Substation

Colorado · MOUNTAIN PARKS ELECTRIC, INC

Max voltage
138
kV

WINDY GAP is an electric transmission substation in Colorado, operated by MOUNTAIN PARKS ELECTRIC, INC. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage115 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorMOUNTAIN PARKS ELECTRIC, INC
Co-ownerPUBLIC SERVICE CO OF COLORADO
Co-ownerTRI-STATE G & T ASSN, INC
Coordinates40.1119, -105.9867

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68725138 kVPUBLIC SERVICE CO OF COLORADO13.4 mi
#71915138 kVMOUNTAIN PARKS ELECTRIC, INC0.4 mi
#68726115 kVTRI-STATE G & T ASSN, INC25.5 mi
#72350115 kVTRI-STATE G & T ASSN, INC19.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WINDY GAP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WINDY GAP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FRASERSubstation-AdjacentCOGrand County138 kV100 MW1.7 yrs60.9
HENDERSONSubstation-AdjacentCOClear Creek County115 kV100 MW1.7 yrs59.0
BLUE RIVERSubstation-AdjacentCOGrand County230 kV300 MW1.7 yrs58.9
MILLSubstation-AdjacentCOSummit County115 kV100 MW1.7 yrs58.2
UNKNOWN205909Substation-AdjacentCOGrand County115 kV100 MW1.7 yrs56.5
UNKNOWN209003Substation-AdjacentCOGrand County138 kV100 MW1.7 yrs56.3
GREEN MOUTAINSubstation-AdjacentCOGrand County115 kV100 MW1.7 yrs55.9
Greenfield (BLUE RIVER - GORE PASS)GreenfieldCOGrand County230 kV300 MW1.7 yrs55.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WINDY GAP substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.