TAP203975

Substation

Colorado · PUBLIC SERVICE CO OF COLORADO

Max voltage
345
kV

TAP203975 is an electric transmission substation in Colorado, operated by PUBLIC SERVICE CO OF COLORADO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorPUBLIC SERVICE CO OF COLORADO
Co-ownerTRI-STATE G & T ASSN, INC
Co-ownerWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates39.5253, -107.6780

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68699345 kVTRI-STATE G & T ASSN, INC94.6 mi
#68738345 kVPUBLIC SERVICE CO OF COLORADO0.5 mi
#73741345 kVWAPA-- WESTERN AREA POWER ADMINISTRATION3.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203975, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203975 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN203894Substation-AdjacentCOGarfield County230 kV300 MW1.7 yrs66.7
TAP203975Substation-AdjacentCOGarfield County345 kV600 MW1.7 yrs64.4
RIFLE UTESubstation-AdjacentCOGarfield County345 kV600 MW1.7 yrs64.0
PARACHUTESubstation-AdjacentCOGarfield County230 kV300 MW1.7 yrs62.9
UPPER MOLINASubstation-AdjacentCODelta County115 kV100 MW1.7 yrs60.9
Greenfield (CRAIG - TAP203975)GreenfieldCOGarfield County345 kV600 MW1.7 yrs59.7
Greenfield (RIFLE UTE - GRAND JUNCTION)GreenfieldCOGarfield County345 kV600 MW1.7 yrs58.8
Greenfield (RIFLE UTE - GRAND JUNCTION)GreenfieldCOGarfield County345 kV600 MW1.7 yrs58.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203975 substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.