Delta County, Colorado · WECC

DC Readiness
60.9
Good / 100

UPPER MOLINA is a substation-adjacent datacenter candidate site in Delta County, Colorado, interconnecting through WECC. It screens at 60.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUPPER MOLINA
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPSTRATA Vernal Data Center
IXP distance121.5 mi
Fiber providers4
Fiber coverage95.1%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance234.2 mi

Site characteristics

Parcel ownerUnited States Government
Parcel APN2715-333-00-477
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index71.1 (avg 100)

Location context

Nearest datacenterStrata Networks
DC distance121.5 mi
Nearest rail14.4 mi
Nearest gas pipeline2.1 mi
Nearest fiber route147.2 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity9.73¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$7,364

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
33
Fiber connectivity12%
65
Energy cost10%
89
Water risk8%
36
Natural hazard8%
75
Buildability7%
95
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
91
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Delta County, ranked by DC Readiness.

Sites near UPPER MOLINA
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN205920Substation-Adjacent115 kV100 MW1.7 yrs62.0
JUANITASubstation-Adjacent115 kV100 MW1.7 yrs61.5
UNKNOWN207591Substation-Adjacent115 kV100 MW1.7 yrs61.4
UNKNOWN203749Substation-Adjacent115 kV100 MW1.7 yrs61.2
TAP205179Substation-Adjacent115 kV100 MW1.7 yrs61.1
TAP203976Substation-Adjacent115 kV100 MW1.7 yrs61.1
Greenfield (RIFLE PSCO - CURECANTI)Greenfield230 kV300 MW1.7 yrs60.6
HOTCHKISSSubstation-Adjacent138 kV100 MW1.7 yrs60.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UPPER MOLINA, Delta County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.