LIMON GENERATING STATION

Substation

Colorado · TRI-STATE G & T ASSN, INC

Max voltage
230
kV

LIMON GENERATING STATION is an electric transmission substation in Colorado, operated by TRI-STATE G & T ASSN, INC. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorTRI-STATE G & T ASSN, INC
Coordinates39.2038, -103.7002

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73278230 kVTRI-STATE G & T ASSN, INC0.1 mi
#73279230 kVTRI-STATE G & T ASSN, INC0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LIMON GENERATING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LIMON GENERATING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG SANDYSubstation-AdjacentCOLincoln County230 kV300 MW1.7 yrs68.5
LINCOLNSubstation-AdjacentCOLincoln County230 kV300 MW1.7 yrs66.8
LIMON WIND #1Substation-AdjacentCOElbert County345 kV600 MW1.7 yrs64.6
CEDAR POINT WINDSubstation-AdjacentCOElbert County230 kV300 MW1.7 yrs62.7
LIMON WIND #2Substation-AdjacentCOLincoln County345 kV600 MW1.7 yrs62.7
UNKNOWN203962Substation-AdjacentCOLincoln County115 kV100 MW1.7 yrs62.5
LIMONSubstation-AdjacentCOLincoln County115 kV100 MW1.7 yrs62.4
Greenfield (MIDWAY - LINCOLN)GreenfieldCOLincoln County230 kV300 MW1.7 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LIMON GENERATING STATION substation, Colorado. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.