Lincoln County, Colorado · WECC

DC Readiness
68.5
Good / 100

BIG SANDY is a substation-adjacent datacenter candidate site in Lincoln County, Colorado, interconnecting through WECC. It screens at 68.5/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBIG SANDY
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPEdgeConneX Denver (EDCDEN01)
IXP distance65.8 mi
Fiber providers4
Fiber coverage96.8%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance431.7 mi

Site characteristics

Parcel ownerTRI-STATE G & T ASSN, INC
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index56.8 (avg 100)

Location context

Nearest datacenterDatacenter 00476609221
DC distance58.5 mi
Nearest rail3.3 mi
Nearest gas pipeline13.3 mi
Nearest fiber route63.4 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.35¢/kWh
Industrial electricity10.55¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$900

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
33
Fiber connectivity12%
73
Energy cost10%
89
Water risk8%
56
Natural hazard8%
75
Buildability7%
95
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
100
Gas pipeline2%
57
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Lincoln County, ranked by DC Readiness.

Sites near BIG SANDY
SiteTypeVoltageCapacityQueue waitScore
LINCOLNSubstation-Adjacent230 kV300 MW1.7 yrs66.8
LIMON WIND #2Substation-Adjacent345 kV600 MW1.7 yrs62.7
UNKNOWN203962Substation-Adjacent115 kV100 MW1.7 yrs62.5
Greenfield (MIDWAY - LINCOLN)Greenfield230 kV300 MW1.7 yrs62.4
LIMONSubstation-Adjacent115 kV100 MW1.7 yrs62.4
Greenfield (MIDWAY - LINCOLN)Greenfield230 kV300 MW1.7 yrs61.4
UNKNOWN203953Substation-Adjacent115 kV100 MW1.7 yrs60.6
Greenfield (LINCOLN - BIG SANDY)Greenfield230 kV300 MW1.7 yrs60.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.