CEDAR POINT WIND

Substation

Colorado · PUBLIC SERVICE CO OF COLORADO

Max voltage
230
kV

CEDAR POINT WIND is an electric transmission substation in Colorado, operated by PUBLIC SERVICE CO OF COLORADO. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorPUBLIC SERVICE CO OF COLORADO
Coordinates39.4109, -103.6949

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73236230 kVPUBLIC SERVICE CO OF COLORADO2.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CEDAR POINT WIND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CEDAR POINT WIND substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG SANDYSubstation-AdjacentCOLincoln County230 kV300 MW1.7 yrs68.5
LINCOLNSubstation-AdjacentCOLincoln County230 kV300 MW1.7 yrs66.8
MISSLE SITESubstation-AdjacentCOArapahoe County345 kV600 MW1.7 yrs66.2
LIMON WIND #1Substation-AdjacentCOElbert County345 kV600 MW1.7 yrs64.6
LIMON WIND #2Substation-AdjacentCOLincoln County345 kV600 MW1.7 yrs62.7
CEDAR POINT WINDSubstation-AdjacentCOElbert County230 kV300 MW1.7 yrs62.7
UNKNOWN203962Substation-AdjacentCOLincoln County115 kV100 MW1.7 yrs62.5
LIMONSubstation-AdjacentCOLincoln County115 kV100 MW1.7 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.