KAYENTA

Substation

Arizona · NAVAJO TRIBAL UTILITY AUTHORITY

Max voltage
230
kV

KAYENTA is an electric transmission substation in Arizona, operated by NAVAJO TRIBAL UTILITY AUTHORITY. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorNAVAJO TRIBAL UTILITY AUTHORITY
StateArizona
Coordinates36.7822, -110.2361

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83722230 kVNAVAJO TRIBAL UTILITY AUTHORITYIN SERVICE19.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of KAYENTA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near KAYENTA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KAYENTASubstation-AdjacentUTSan Juan County230 kV300 MW3.5 yrs65.8
LONGHOUSE VALLEYSubstation-AdjacentUTSan Juan County230 kV300 MW5.7 yrs62.6
Greenfield (SHIPROCK - KAYENTA)GreenfieldUTSan Juan County230 kV300 MW3.5 yrs60.4
Greenfield (SHIPROCK - KAYENTA)GreenfieldUTSan Juan County230 kV300 MW3.5 yrs60.2
Greenfield (SHIPROCK - KAYENTA)GreenfieldUTSan Juan County230 kV300 MW3.5 yrs60.0
Greenfield (LONGHOUSE VALLEY - NAVAJO)GreenfieldUTKane County230 kV300 MW5.7 yrs58.4
Greenfield (KAYENTA - LONGHOUSE VALLEY)GreenfieldUTSan Juan County230 kV300 MW5.7 yrs58.2
Greenfield (KAYENTA - LONGHOUSE VALLEY)GreenfieldUTSan Juan County230 kV300 MW5.7 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for KAYENTA substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.