Greenfield (KAYENTA - LONGHOUSE VALLEY)

Greenfield

San Juan County, Utah · WECC

DC Readiness
57.3
Good / 100

Greenfield (KAYENTA - LONGHOUSE VALLEY) is a greenfield datacenter candidate site in San Juan County, Utah, interconnecting through WECC. It screens at 57.3/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 5.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationKAYENTA
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth68
Avg queue wait5.7 yrs
Recent queue wait5.7 yrs
Completion rate10%
Withdrawal rate90%

Connectivity

Fiber providers1
Fiber coverage50.4%
Nearest cloud providerAzure
Nearest cloud regionwestus3
Cloud region distance247.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerNAVAJO TRIBAL UTILITY AUTHORITY
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone D
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index52.8 (avg 100)

Location context

Nearest rail15.8 mi
Nearest gas pipeline4.8 mi
Nearest fiber route251.5 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.74¢/kWh
Industrial electricity11.17¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$748

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
30
Fiber connectivity12%
50
Energy cost10%
90
Water risk8%
48
Natural hazard8%
85
Buildability7%
70
Labor market4%
50
DC cluster4%
10
Land / acreage3%
55
Construction cost3%
100
Gas pipeline2%
85
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in San Juan County, ranked by DC Readiness.

Sites near Greenfield (KAYENTA - LONGHOUSE VALLEY)
SiteTypeVoltageCapacityQueue waitScore
KAYENTASubstation-Adjacent230 kV300 MW3.5 yrs65.8
PINTOSubstation-Adjacent345 kV600 MW1.7 yrs64.7
LONGHOUSE VALLEYSubstation-Adjacent230 kV300 MW5.7 yrs62.6
HATCHSubstation-Adjacent138 kV100 MW1.7 yrs61.6
Greenfield (PINTO - FOUR CORNERS)Greenfield345 kV600 MW3.5 yrs61.5
Greenfield (HUNTINGTON - PINTO)Greenfield345 kV600 MW1.7 yrs61.3
Greenfield (PINTO - FOUR CORNERS)Greenfield345 kV600 MW3.5 yrs60.8
Greenfield (SHIPROCK - KAYENTA)Greenfield230 kV300 MW3.5 yrs60.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (KAYENTA - LONGHOUSE VALLEY), San Juan County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.