Greenfield (TECKLA - OSAGE)

Greenfield

Weston, Wyoming · WECC

DC Readiness
54.6
Fair / 100

Greenfield (TECKLA - OSAGE) is a greenfield datacenter candidate site in Weston, Wyoming, interconnecting through WECC. It screens at 54.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTECKLA
Substation voltage138 kV
Available capacity100 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPACT Gillette
IXP distance34.2 mi
Fiber providers3
Fiber coverage44.5%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance404.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerPOWDER RIVER ENERGY CORPORATION
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)2.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score90/100
Construction cost index87.2 (avg 100)

Location context

Nearest datacenterACT Gillette
DC distance34.2 mi
Nearest rail9.3 mi
Nearest gas pipeline13.2 mi
Nearest fiber route155.3 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity10.68¢/kWh
Industrial electricity8.14¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$953

Incentive detail: No state corporate or personal income tax; low property taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
31
Fiber connectivity12%
55
Energy cost10%
94
Water risk8%
39
Natural hazard8%
90
Buildability7%
70
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
77
Gas pipeline2%
58
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Weston, ranked by DC Readiness.

Sites near Greenfield (TECKLA - OSAGE)
SiteTypeVoltageCapacityQueue waitScore
TAP205630Substation-Adjacent230 kV300 MW1.7 yrs68.3
UNKNOWN201481Substation-Adjacent230 kV300 MW1.7 yrs67.7
TAP203672Substation-Adjacent230 kV300 MW1.7 yrs66.8
TECKLASubstation-Adjacent230 kV300 MW1.7 yrs66.6
TAP204301Substation-Adjacent115 kV100 MW1.7 yrs63.6
UNKNOWN204407Substation-Adjacent115 kV100 MW1.7 yrs63.6
UNKNOWN205633Substation-Adjacent115 kV100 MW1.7 yrs63.3
UNKNOWN205116Substation-Adjacent115 kV100 MW1.7 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TECKLA - OSAGE), Weston. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.