Greenfield (TREMVAL - BRIGGS ROAD)

Greenfield

Trempealeau County, Wisconsin · MISO

DC Readiness
60.6
Good / 100

Greenfield (TREMVAL - BRIGGS ROAD) is a greenfield datacenter candidate site in Trempealeau County, Wisconsin, interconnecting through MISO. It screens at 60.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTREMVAL
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPSFN MN-Rochester
IXP distance60.8 mi
Fiber providers3
Fiber coverage38.3%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance185.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerDAIRYLAND POWER COOPERATIVE
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index72.1 (avg 100)

Location context

Nearest datacenterWest Wisconsin Telcom DC
DC distance56.1 mi
Nearest rail6.1 mi
Nearest gas pipeline5.9 mi
Nearest fiber route122.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.21¢/kWh
Industrial electricity9.03¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$4,892

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power15%
57
Fiber connectivity12%
56
Energy cost10%
86
Water risk8%
94
Natural hazard8%
78
Buildability7%
45
Labor market4%
50
DC cluster4%
45
Land / acreage3%
47
Construction cost3%
90
Gas pipeline2%
81
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Trempealeau County, ranked by DC Readiness.

Sites near Greenfield (TREMVAL - BRIGGS ROAD)
SiteTypeVoltageCapacityQueue waitScore
TREMVALSubstation-Adjacent161 kV100 MW1.4 yrs65.9
JACKSON COUNTYSubstation-Adjacent161 kV100 MW1.4 yrs64.9
Greenfield (NORTH ROCHESTER - BRIGGS ROAD)Greenfield345 kV600 MW1.4 yrs63.2
Greenfield (JACKSON COUNTY - TREMVAL)Greenfield161 kV100 MW1.4 yrs61.4
Greenfield (ALMA - TREMVAL)Greenfield161 kV100 MW1.4 yrs57.9
Greenfield (SEVEN MILE - TREMVAL)Greenfield161 kV100 MW1.4 yrs56.7
Greenfield (TREMVAL - BRIGGS ROAD)Greenfield161 kV100 MW1.4 yrs55.2
Greenfield (ALMA - TREMVAL)Greenfield161 kV100 MW1.4 yrs54.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TREMVAL - BRIGGS ROAD), Trempealeau County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.