Greenfield (CLINCH RIVER - TAP151951)

Greenfield

WASHINGTON, Virginia · PJM

DC Readiness
56.1
Good / 100

Greenfield (CLINCH RIVER - TAP151951) is a greenfield datacenter candidate site in WASHINGTON, Virginia, interconnecting through PJM. It screens at 56.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCLINCH RIVER
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.08¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth221
Avg queue wait3.6 yrs
Recent queue wait4.7 yrs
Completion rate7%
Withdrawal rate93%

Connectivity

Nearest IXPEast Kentucky Network Data Center
IXP distance65.6 mi
Fiber providers6
Fiber coverage95.8%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance117.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerAPPALACHIAN POWER CO
Land owner typeprivate
Buildability50.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index74.8 (avg 100)

Location context

Nearest datacenterEast Kentucky Network Datacenter
DC distance65.7 mi
Nearest rail6.4 mi
Nearest gas pipeline7.9 mi
Nearest fiber route15.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.10¢/kWh
Industrial electricity5.48¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,621

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
43
Fiber connectivity12%
68
Energy cost10%
81
Water risk8%
82
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
25
Land / acreage3%
46
Construction cost3%
88
Gas pipeline2%
75
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in WASHINGTON, ranked by DC Readiness.

Sites near Greenfield (CLINCH RIVER - TAP151951)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (SULLIVAN - BROADFORD (765 KV))Greenfield500 kV1,000 MW3.7 yrs73.3
Greenfield (SULLIVAN - BROADFORD (765 KV))Greenfield500 kV1,000 MW3.7 yrs72.0
UNKNOWN156532Substation-Adjacent138 kV100 MW3.7 yrs71.9
Greenfield (SULLIVAN - BROADFORD (765 KV))Greenfield500 kV1,000 MW3.7 yrs69.0
ABINGDONSubstation-Adjacent138 kV100 MW3.6 yrs68.5
UNKNOWN117054Substation-Adjacent138 kV100 MW3.6 yrs66.7
UNKNOWN113972Substation-Adjacent138 kV100 MW3.6 yrs65.4
SALTVILLESubstation-Adjacent138 kV100 MW3.6 yrs61.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (CLINCH RIVER - TAP151951), WASHINGTON. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.