Bellmeade Power Station is a brownfield datacenter candidate site in Richmond City, Virginia, interconnecting through PJM. It screens at 77.5/100 DC Readiness with a catalogued 330 MW of candidate capacity.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Richmond City, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SPRUANCE NUG | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 77.1 |
| TAP146366 | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 76.4 |
| LAKESIDE | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 75.7 |
| PLAZA | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 75.3 |
| BASIN | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 74.7 |
| IRON BRIDGE | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 74.4 |
| RIVER ROAD | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 74.2 |
| CHARLES CITY ROAD | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 74.0 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Bellmeade Power Station, Richmond City. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.