OZ Edgefield

Greenfield

Edgefield, South Carolina · SERC

DC Readiness
62.0
Good / 100

OZ Edgefield is a greenfield datacenter candidate site in Edgefield, South Carolina, interconnecting through SERC. It screens at 62.0/100 DC Readiness and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPColumbia County Community Broadband Utility
IXP distance18.9 mi
Fiber providers7
Fiber coverage81.8%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance112.5 mi

Site characteristics

Site typeGreenfield
Land contactEdgefield County Assessor
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteGENERAC POWER SYSTEMS TRENTON
Hazard sub-score50/100
Construction cost index72.5 (avg 100)

Location context

Nearest datacenterMeta Aiken Data Center
DC distance4.4 mi
Nearest rail2.1 mi
Nearest gas pipeline8.0 mi
Nearest fiber route116.0 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.23¢/kWh
Industrial electricity7.30¢/kWh
Cooling degree days2,000
Heating degree days2,400
Land price / acre$4,696

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
67
Fiber connectivity12%
81
Energy cost10%
91
Water risk8%
84
Natural hazard8%
50
Buildability7%
40
Labor market4%
50
DC cluster4%
85
Land / acreage3%
49
Construction cost3%
90
Gas pipeline2%
74
Tax incentive2%
100
Climate / cooling2%
25

Nearby comparable sites

Other scored datacenter candidate sites in Edgefield, ranked by DC Readiness.

Sites near OZ Edgefield
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN167525Substation-Adjacent115 kV100 MW1.0 yrs63.8
UNKNOWN116808Substation-Adjacent115 kV100 MW1.0 yrs63.6
TAP141824Substation-Adjacent115 kV100 MW1.0 yrs63.4
TAP141843Substation-Adjacent115 kV100 MW1.0 yrs63.2
UNKNOWN117193Substation-Adjacent115 kV100 MW1.0 yrs62.9
UNKNOWN116810Substation-Adjacent115 kV100 MW1.0 yrs62.7
UNKNOWN170038Substation-Adjacent115 kV100 MW1.0 yrs62.6
UNKNOWN116728Substation-Adjacent115 kV100 MW1.0 yrs61.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Edgefield, Edgefield. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.