Greenfield (SUMMER LAKE - BURNS) is a greenfield datacenter candidate site in Lake County, Oregon, interconnecting through WECC. It screens at 57.3/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSUMMER LAKE
Substation voltage500 kV
Available capacity1,000 MW
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPFort Rock Data Center
IXP distance74.4 mi
Fiber providers3
Fiber coverage1.8%
Nearest cloud providerAWS
Nearest cloud regionus-west-2
Cloud region distance188.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerMIDSTATE ELECTRIC COOP, INC
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)2.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index67.3 (avg 100)

Location context

Nearest datacenterDatacenter 752001022
DC distance74.4 mi
Nearest rail2.5 mi
Nearest gas pipeline57.0 mi
Nearest fiber route78.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.99¢/kWh
Industrial electricity8.63¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$2,108

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
32
Fiber connectivity12%
10
Energy cost10%
94
Water risk8%
64
Natural hazard8%
78
Buildability7%
70
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
94
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Lake County, ranked by DC Readiness.

Sites near Greenfield (SUMMER LAKE - BURNS)
SiteTypeVoltageCapacityQueue waitScore
FORT ROCKSubstation-Adjacent500 kV1,000 MW1.7 yrs65.5
SUMMER LAKESubstation-Adjacent500 kV1,000 MW1.7 yrs64.0
SYCANSubstation-Adjacent500 kV1,000 MW5.7 yrs62.8
Greenfield (CELILO - SYLMAR EAST)Greenfield1000 kV1,000 MW5.8 yrs60.8
Greenfield (CELILO - SYLMAR EAST)Greenfield1000 kV1,000 MW5.8 yrs60.6
Greenfield (CELILO - SYLMAR EAST)Greenfield1000 kV1,000 MW5.8 yrs60.5
Greenfield (CELILO - SYLMAR EAST)Greenfield1000 kV1,000 MW5.8 yrs59.7
Greenfield (SYCAN - FORT ROCK)Greenfield500 kV1,000 MW1.7 yrs59.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (SUMMER LAKE - BURNS), Lake County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.