Mine Site

Former Mine

Oswego, New York · PJM

DC Readiness
38.5
Limited / 100

Mine Site is a former mine datacenter candidate site in Oswego, New York, interconnecting through PJM. It screens at 38.5/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth411

Connectivity

Nearest IXPWestelcom Networks Watertown
IXP distance26.8 mi

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterWestelcom Networks Watertown
DC distance26.8 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.82¢/kWh
Industrial electricity4.55¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$2,848

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
21
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Oswego, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
SITHESubstation-Adjacent345 kV600 MW3.5 yrs63.7
NINE MILESubstation-Adjacent345 kV600 MW3.5 yrs63.7
TAP140467Substation-Adjacent115 kV100 MW3.5 yrs62.4
OSWEGOSubstation-Adjacent345 kV600 MW3.5 yrs62.1
FAY STREETSubstation-Adjacent115 kV100 MW3.5 yrs61.8
Greenfield (CLAY - SITHE)Greenfield345 kV600 MW3.5 yrs61.7
Greenfield (ELBRIDGE - OSWEGO)Greenfield345 kV600 MW3.5 yrs61.7
Greenfield (CLAY - VOLNEY)Greenfield345 kV600 MW3.5 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Oswego. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.