Datacenter Sites in Oswego, New York

Oswego has 106 scored datacenter candidate sites averaging 53.6/100 DC Readiness, with a catalogued aggregate of 15,793 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

106
Candidate sites
53.6/100
Avg DC Readiness
15,793 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Oswego

Site-selection context for Oswego

Yessales_tax_exemption
Datacenter tax incentive
7.82¢/kWh
Commercial electricity
4.55¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$2,848
Land price / acre
700
Cooling degree days
6,100
Heating degree days
46°F
Mean annual temp

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

By site type

Top datacenter sites in Oswego

Top datacenter sites in Oswego
SiteTypeVoltageCapacityQueue waitScore
VOLNEYSubstation-Adjacent345 kV600 MW4.9 yrs59.4
OSWEGOSubstation-Adjacent345 kV600 MW4.9 yrs58.9
UNKNOWN125477Substation-Adjacent345 kV600 MW4.9 yrs57.6
NINE MILESubstation-Adjacent345 kV600 MW4.9 yrs57.6
TAP140467Substation-Adjacent115 kV100 MW4.9 yrs56.2
EC Near Oswego Harbor PowerGreenfield3.5 yrs55.3
TAP140464Substation-Adjacent115 kV100 MW4.9 yrs55.1
GILBERT MILLSSubstation-Adjacent115 kV100 MW4.9 yrs54.8
UNKNOWN161765Substation-Adjacent115 kV100 MW4.9 yrs54.8
TAP141068Substation-Adjacent115 kV100 MW4.9 yrs54.3
TAP141069Substation-Adjacent115 kV100 MW4.9 yrs54.1
UNKNOWN125473Substation-Adjacent115 kV100 MW4.9 yrs54.1
FAY STREETSubstation-Adjacent115 kV100 MW4.9 yrs54.0
BRISTOL HILLSubstation-Adjacent115 kV100 MW4.9 yrs53.7
342 Main St Site #35Industrial4.9 yrs53.2
UNKNOWN125564Substation-Adjacent115 kV100 MW4.9 yrs52.3
TAP140463Substation-Adjacent115 kV100 MW4.9 yrs52.2
TAP141065Substation-Adjacent115 kV100 MW4.9 yrs52.1
Mine SiteFormer Mine3.8 yrs52.0
Mine SiteFormer Mine4.9 yrs52.0
Mine SiteFormer Mine4.9 yrs51.7
947 South First Street Site #24Industrial4.9 yrs51.7
A.L. Lee Memorial Hospital site #19Industrial4.9 yrs51.6
City of Fulton MacCaddam Construction Site #78Industrial4.9 yrs51.5
Former DPW Site Site #80Industrial4.9 yrs51.5

Oswego datacenter FAQ

How many datacenter sites are in Oswego?
106 scored datacenter candidate sites, averaging 53.6/100 DC Readiness.
Does Oswego offer datacenter tax incentives?
Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
What is the natural-hazard risk in Oswego?
FEMA's National Risk Index rates Oswego as "Relatively High" (score 35).
What are industrial electricity rates in Oswego?
Average industrial electricity is 4.55¢/kWh and commercial is 7.82¢/kWh in Oswego.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Oswego, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.