Greenfield (UNKNOWN145284 - TAP145432)

Greenfield

Jefferson County, New York · NYISO

DC Readiness
54.8
Fair / 100

Greenfield (UNKNOWN145284 - TAP145432) is a greenfield datacenter candidate site in Jefferson County, New York, interconnecting through NYISO. It screens at 54.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN145284
Substation voltage115 kV
Available capacity100 MW
LMP zoneNYISO_CAPITL
Wholesale LMP$55.47/MWh
Utility commercial rate0.07¢/kWh

Speed to power

ISO / RTO regionNYISO
Queue depth426
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXPWestelcom Networks Watertown
IXP distance11.0 mi
Fiber providers9
Fiber coverage20.0%
Nearest cloud providerGCP
Nearest cloud regionus-east5
Cloud region distance320.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerNIAGARA MOHAWK POWER CORP.
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index87.2 (avg 100)

Location context

Nearest datacenterWestelcom Networks Watertown
DC distance11.0 mi
Nearest rail9.2 mi
Nearest gas pipeline32.9 mi
Nearest fiber route17.3 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.42¢/kWh
Industrial electricity3.98¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$2,496

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
26
Fiber connectivity12%
66
Energy cost10%
69
Water risk8%
90
Natural hazard8%
65
Buildability7%
75
Labor market4%
50
DC cluster4%
80
Land / acreage3%
52
Construction cost3%
77
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN145284 - TAP145432)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125576Substation-Adjacent115 kV100 MW3.5 yrs65.7
REENERGY BLACK RIVERSubstation-Adjacent115 kV100 MW3.5 yrs65.6
TAP139311Substation-Adjacent115 kV100 MW3.5 yrs65.1
UNKNOWN125581Substation-Adjacent115 kV100 MW3.5 yrs63.6
TAP139306Substation-Adjacent115 kV100 MW3.5 yrs63.0
GLEN PARK HYDROELECTRIC PROJECTSubstation-Adjacent115 kV100 MW3.5 yrs63.0
TAP139307Substation-Adjacent115 kV100 MW3.5 yrs62.6
TAP139312Substation-Adjacent115 kV100 MW3.5 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN145284 - TAP145432), Jefferson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.