Montrose

Brownfield

Henry, Missouri · MISO

DC Readiness
64.9
Good / 100

Montrose is a brownfield datacenter candidate site in Henry, Missouri, interconnecting through MISO. It screens at 64.9/100 DC Readiness with a catalogued 564 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Available capacity564 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPQTS Overland Park (OVP1)
IXP distance56.8 mi
Fiber providers6
Fiber coverage74.3%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance228.0 mi

Site characteristics

Site typeBrownfield
Parcel ownerEvergy Metro
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usecoal
Existing capacity564 MW
Retirement date2018-12-01

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteEVERGY INC MONTROSE GENERATING STATION
Hazard sub-score37/100
Construction cost index85.6 (avg 100)

Location context

Nearest datacenterQTS Overland Park (OVP1)
DC distance56.8 mi
Nearest rail0.1 mi
Nearest gas pipeline7.8 mi
Nearest fiber route39.9 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.72¢/kWh
Industrial electricity7.00¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,028

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
48
Speed to power15%
59
Fiber connectivity12%
71
Energy cost10%
89
Water risk8%
88
Natural hazard8%
37
Buildability7%
100
Labor market4%
50
DC cluster4%
40
Land / acreage3%
58
Construction cost3%
79
Gas pipeline2%
75
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Henry, ranked by DC Readiness.

Sites near Montrose
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121362Substation-Adjacent161 kV100 MW1.4 yrs67.8
UNKNOWN117542Substation-Adjacent161 kV100 MW1.4 yrs65.8
UNKNOWN121358Substation-Adjacent161 kV100 MW1.4 yrs65.1
UNKNOWN117439Substation-Adjacent161 kV100 MW1.4 yrs62.5
EC Coal Henry CountyGreenfield1.4 yrs61.4
UNKNOWN117441Substation-Adjacent161 kV100 MW1.4 yrs60.5
UNKNOWN117384Substation-Adjacent161 kV100 MW1.4 yrs60.3
Greenfield (UNKNOWN117441 - UNKNOWN117604)Greenfield161 kV100 MW1.4 yrs60.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Montrose, Henry. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.