Greenfield (LEAKE - KOSCIUSKO)

Greenfield

LEAKE, Mississippi · MISO

DC Readiness
57.4
Good / 100

Greenfield (LEAKE - KOSCIUSKO) is a greenfield datacenter candidate site in LEAKE, Mississippi, interconnecting through MISO. It screens at 57.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationLEAKE
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance57.7 mi
Fiber providers4
Fiber coverage26.4%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance421.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index97.8 (avg 100)

Location context

Nearest datacenterAmazon Canton Data Center
DC distance38.9 mi
Nearest rail9.2 mi
Nearest gas pipeline0.5 mi
Nearest fiber route9.5 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.53¢/kWh
Industrial electricity6.95¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,798

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power15%
54
Fiber connectivity12%
51
Energy cost10%
88
Water risk8%
90
Natural hazard8%
55
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
69
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in LEAKE, ranked by DC Readiness.

Sites near Greenfield (LEAKE - KOSCIUSKO)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (MCADAMS - LAKEOVER)Greenfield500 kV1,000 MW1.4 yrs65.4
UNKNOWN169468Substation-Adjacent161 kV100 MW1.4 yrs63.7
UNKNOWN109387Substation-Adjacent115 kV100 MW1.4 yrs61.7
CARTHAGE (MS)Substation-Adjacent115 kV100 MW1.4 yrs61.2
LEAKESubstation-Adjacent161 kV100 MW1.4 yrs61.0
SINGLETONSubstation-Adjacent161 kV100 MW1.4 yrs59.9
Greenfield (LEAKE - KOSCIUSKO)Greenfield161 kV100 MW1.4 yrs58.6
Greenfield (CARTHAGE (MS) - TAP144786)Greenfield115 kV100 MW1.4 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.