Greenfield (VERGENNES - NELSON ROAD)

Greenfield

Montcalm County, Michigan · PJM

DC Readiness
63.3
Good / 100

Greenfield (VERGENNES - NELSON ROAD) is a greenfield datacenter candidate site in Montcalm County, Michigan, interconnecting through PJM. It screens at 63.3/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationVERGENNES
Substation voltage345 kV
Available capacity600 MW
LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPLiquid Web DC3
IXP distance38.8 mi
Fiber providers8
Fiber coverage57.3%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance161.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerCONSUMERS ENERGY CO
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index76.1 (avg 100)

Location context

Nearest datacenterLiquid Web, Inc
DC distance38.8 mi
Nearest rail6.2 mi
Nearest gas pipeline10.7 mi
Nearest fiber route157.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity12.42¢/kWh
Industrial electricity6.81¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$4,937

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
56
Fiber connectivity12%
62
Energy cost10%
81
Water risk8%
95
Natural hazard8%
75
Buildability7%
15
Labor market4%
50
DC cluster4%
45
Land / acreage3%
47
Construction cost3%
87
Gas pipeline2%
65
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Montcalm County, ranked by DC Readiness.

Sites near Greenfield (VERGENNES - NELSON ROAD)
SiteTypeVoltageCapacityQueue waitScore
NELSON ROADSubstation-Adjacent345 kV600 MW2.2 yrs72.1
Greenfield (NELSON ROAD - KENOWA)Greenfield345 kV600 MW2.2 yrs67.5
UNKNOWN132521Substation-Adjacent138 kV100 MW2.2 yrs67.4
Greenfield (NELSON ROAD - KENOWA)Greenfield345 kV600 MW2.2 yrs67.4
Greenfield (VERGENNES - NELSON ROAD)Greenfield345 kV600 MW2.2 yrs67.1
UNKNOWN138477Substation-Adjacent138 kV100 MW2.2 yrs67.0
UNKNOWN132522Substation-Adjacent138 kV100 MW2.2 yrs66.9
UNKNOWN157953Substation-Adjacent138 kV100 MW2.2 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (VERGENNES - NELSON ROAD), Montcalm County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.