Greenfield (KALAMAZOO RIVER GENERATING STA)

Greenfield

Kalamazoo County, Michigan · PJM

DC Readiness
55.6
Good / 100

Greenfield (KALAMAZOO RIVER GENERATING STA) is a greenfield datacenter candidate site in Kalamazoo County, Michigan, interconnecting through PJM. It screens at 55.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationKALAMAZOO RIVER GENERATING STATION
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPAunalytics Kalamazoo Datacenter
IXP distance16.0 mi
Fiber providers15
Fiber coverage49.4%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance118.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerCONSUMERS ENERGY CO
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSPRING LAKE
Hazard sub-score65/100
Construction cost index101.4 (avg 100)

Location context

Nearest datacenterAunalytics Kalamazoo Datacenter
DC distance16.0 mi
Nearest rail4.2 mi
Nearest gas pipeline11.7 mi
Nearest fiber route123.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.40¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$6,660

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
56
Fiber connectivity12%
36
Energy cost10%
81
Water risk8%
94
Natural hazard8%
65
Buildability7%
45
Labor market4%
50
DC cluster4%
65
Land / acreage3%
44
Construction cost3%
66
Gas pipeline2%
62
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Kalamazoo County, ranked by DC Readiness.

Sites near Greenfield (KALAMAZOO RIVER GENERATING STA)
SiteTypeVoltageCapacityQueue waitScore
ARGENTASubstation-Adjacent345 kV600 MW2.2 yrs73.7
WEEDS LAKESubstation-Adjacent345 kV600 MW2.2 yrs73.0
TAP141281Substation-Adjacent138 kV100 MW2.2 yrs71.8
UNKNOWN128778Substation-Adjacent138 kV100 MW2.2 yrs71.4
TAP141282Substation-Adjacent138 kV100 MW2.2 yrs71.2
TAP145692Substation-Adjacent138 kV100 MW2.2 yrs70.9
Greenfield (TAP138974 - WEEDS LAKE)Greenfield345 kV600 MW2.2 yrs69.8
Greenfield (ARGENTA - PALISADES)Greenfield345 kV600 MW2.2 yrs69.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen