Greenfield (UNKNOWN128569 - UNKNOWN128625)

Greenfield

Gratiot County, Michigan · PJM

DC Readiness
62.6
Good / 100

Greenfield (UNKNOWN128569 - UNKNOWN128625) is a greenfield datacenter candidate site in Gratiot County, Michigan, interconnecting through PJM. It screens at 62.6/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN128569
Substation voltage345 kV
Available capacity600 MW
LMP zonePJM_ATSI
Wholesale LMP$42.97/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait2.2 yrs
Recent queue wait2.2 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPLiquid Web DC3
IXP distance37.5 mi
Fiber providers10
Fiber coverage50.4%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance188.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerCONSUMERS ENERGY CO
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index60.3 (avg 100)

Location context

Nearest datacenterDatacenter 00755540694
DC distance35.5 mi
Nearest rail4.2 mi
Nearest gas pipeline6.7 mi
Nearest fiber route186.6 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.74¢/kWh
Industrial electricity6.33¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$6,512

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
56
Fiber connectivity12%
62
Energy cost10%
81
Water risk8%
91
Natural hazard8%
65
Buildability7%
15
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
100
Gas pipeline2%
78
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Gratiot County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN128569 - UNKNOWN128625)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN128569Substation-Adjacent345 kV600 MW2.2 yrs74.9
RENAISSANCE STATIONSubstation-Adjacent345 kV600 MW2.2 yrs74.9
TAP145748Substation-Adjacent138 kV100 MW2.2 yrs69.5
TAP145655Substation-Adjacent138 kV100 MW2.2 yrs69.0
Greenfield (UNKNOWN128569 - UNKNOWN128625)Greenfield345 kV600 MW2.2 yrs67.8
VESTABURGSubstation-Adjacent138 kV100 MW2.2 yrs67.5
UNKNOWN128546Substation-Adjacent138 kV100 MW2.2 yrs67.2
TAP140108Substation-Adjacent138 kV100 MW2.2 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN128569 - UNKNOWN128625), Gratiot County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.