NOS COOPERATIVE LAB OXFORD MD INSTALLATION

Federal Excess

Talbot, Maryland · ISO-NE

DC Readiness
48.5
Fair / 100

NOS COOPERATIVE LAB OXFORD MD INSTALLATION is a federal excess datacenter candidate site in Talbot, Maryland, interconnecting through ISO-NE. It screens at 48.5/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth48
Avg queue wait3.9 yrs

Connectivity

Nearest IXPAiNET MD-790R
IXP distance39.4 mi
Fiber providers6
Fiber coverage26.9%
Max download76 Mbps

Site characteristics

Acreage12 ac
Land contactTalbot County County Assessor
Former useResearch and Development

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterCyberNAP Glen Burnie
DC distance39.5 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_credits)
Commercial electricity12.95¢/kWh
Industrial electricity11.36¢/kWh
Cooling degree days1,300
Heating degree days4,400
Land price / acre$9,250

Incentive detail: Enterprise Zone property tax credits; personal property tax credits on DC equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
36
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
84
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
26
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Talbot, ranked by DC Readiness.

Sites near NOS COOPERATIVE LAB OXFORD MD INSTALLATION
SiteTypeVoltageCapacityQueue waitScore
EastonBrownfield3 MW3.5 yrs58.3
EC Near EastonGreenfield3.5 yrs57.3
EC Near EastonGreenfield3.5 yrs57.0
EC Near EastonGreenfield3.5 yrs56.8
EC Near EastonGreenfield3.5 yrs56.1
EC Near EastonGreenfield3.5 yrs55.8
EC Near EastonGreenfield3.5 yrs55.6
EC Near EastonGreenfield3.5 yrs55.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NOS COOPERATIVE LAB OXFORD MD INSTALLATION, Talbot. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.