EC Near Hugoton 1

Greenfield

Stevens County, Kansas · SPP

DC Readiness
54.7
Fair / 100

EC Near Hugoton 1 is a greenfield datacenter candidate site in Stevens County, Kansas, interconnecting through SPP. It screens at 54.7/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneSPP_NORTH
Wholesale LMP$21.13/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSPP
Queue depth16
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance135.5 mi
Fiber providers4
Fiber coverage68.9%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance392.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerPIONEER ELECTRIC COOP, INC - (KS)
Land owner typeprivate
Buildability50.0/100
Former usenear retired oil plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)2.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index89.0 (avg 100)

Location context

Nearest datacenterAmarillo Petroleum Building
DC distance135.5 mi
Nearest rail6.9 mi
Nearest gas pipeline4.5 mi
Nearest fiber route19.0 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.47¢/kWh
Industrial electricity9.88¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$1,792

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
51
Fiber connectivity12%
64
Energy cost10%
90
Water risk8%
52
Natural hazard8%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
53
Construction cost3%
76
Gas pipeline2%
86
Tax incentive2%
100
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Stevens County, ranked by DC Readiness.

Sites near EC Near Hugoton 1
SiteTypeVoltageCapacityQueue waitScore
Greenfield (UNKNOWN209699 - HITCHLAND)Greenfield345 kV600 MW3.4 yrs65.4
TAP173412Substation-Adjacent115 kV100 MW3.5 yrs63.2
UNKNOWN118178Substation-Adjacent115 kV100 MW3.5 yrs63.1
UNKNOWN119559Substation-Adjacent115 kV100 MW3.5 yrs62.9
UNKNOWN119535Substation-Adjacent115 kV100 MW3.5 yrs62.4
Greenfield (UNKNOWN119535 - TAP173412)Greenfield115 kV100 MW3.5 yrs59.6
Greenfield (UNKNOWN209699 - HITCHLAND)Greenfield345 kV600 MW3.4 yrs59.5
EC Near Hugoton 1Greenfield3.5 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Hugoton 1, Stevens County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.