UNKNOWN118007

Substation-Adjacent

Sedgwick, Kansas · SPP

DC Readiness
59.8
Good / 100

UNKNOWN118007 is a substation-adjacent datacenter candidate site in Sedgwick, Kansas, interconnecting through SPP. It screens at 59.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN118007
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zoneSPP_NORTH
Wholesale LMP$21.13/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSPP
Queue depth16
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPBeloit-NOC
IXP distance122.1 mi
Fiber providers13
Fiber coverage81.2%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance253.8 mi

Site characteristics

Parcel ownerWESTAR ENERGY INC
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)2.40
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score40/100
Construction cost index83.0 (avg 100)

Location context

Nearest datacenterBeloit-NOC
DC distance122.1 mi
Nearest rail2.4 mi
Nearest gas pipeline2.1 mi
Nearest fiber route1.0 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.24¢/kWh
Industrial electricity7.71¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$3,923

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
51
Fiber connectivity12%
71
Energy cost10%
88
Water risk8%
52
Natural hazard8%
40
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
81
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Sedgwick, ranked by DC Readiness.

Sites near UNKNOWN118007
SiteTypeVoltageCapacityQueue waitScore
Gordon Evans Energy CenterBrownfield526 MW72.2
WICHITASubstation-Adjacent345 kV600 MW3.5 yrs69.5
UNKNOWN168687Substation-Adjacent345 kV600 MW3.5 yrs69.3
UNKNOWN168685Substation-Adjacent345 kV600 MW3.5 yrs69.1
UNKNOWN118003Substation-Adjacent138 kV100 MW3.5 yrs67.7
UNKNOWN118016Substation-Adjacent138 kV100 MW3.5 yrs65.9
UNKNOWN119286Substation-Adjacent138 kV100 MW3.5 yrs65.8
UNKNOWN118005Substation-Adjacent138 kV100 MW3.5 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN118007, Sedgwick. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.