Midwest Iron

Industrial

Reno County, Kansas · SPP

DC Readiness
43.6
Fair / 100

Midwest Iron is a industrial datacenter candidate site in Reno County, Kansas, interconnecting through SPP. It screens at 43.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth16

Connectivity

Nearest IXPBeloit-NOC
IXP distance97.4 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterCloud Storage Corp
DC distance93.0 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.97¢/kWh
Industrial electricity8.41¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,641

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
52
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Reno County, ranked by DC Readiness.

Sites near Midwest Iron
SiteTypeVoltageCapacityQueue waitScore
Hutchinson Energy CenterBrownfield253 MW69.6
UNKNOWN118040Substation-Adjacent230 kV300 MW3.5 yrs66.1
HUTCHINSON ENERGY CENTERSubstation-Adjacent115 kV100 MW3.5 yrs65.9
UNKNOWN118026Substation-Adjacent115 kV100 MW3.5 yrs65.4
UNKNOWN119867Substation-Adjacent115 kV100 MW3.5 yrs64.9
TAP138838Substation-Adjacent115 kV100 MW3.5 yrs64.8
TAP138840Substation-Adjacent115 kV100 MW3.5 yrs64.2
Greenfield (UNKNOWN118036 - UNKNOWN118040)Greenfield230 kV300 MW3.5 yrs64.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Midwest Iron, Reno County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.