Greenfield (UNKNOWN125098 - UNKNOWN125100)

Greenfield

SHELBY, Indiana · PJM

DC Readiness
62.2
Good / 100

Greenfield (UNKNOWN125098 - UNKNOWN125100) is a greenfield datacenter candidate site in SHELBY, Indiana, interconnecting through PJM. It screens at 62.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN125098
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPDartPoints Columbus, IN - CLU1
IXP distance16.0 mi
Fiber providers11
Fiber coverage44.5%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance159.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerDUKE ENERGY INDIANA, LLC
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score53/100
Construction cost index85.4 (avg 100)

Location context

Nearest datacenterDatacenter 567894059
DC distance15.8 mi
Nearest rail4.0 mi
Nearest gas pipeline1.1 mi
Nearest fiber route36.3 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.24¢/kWh
Industrial electricity8.70¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$10,164

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
35
Fiber connectivity12%
72
Energy cost10%
89
Water risk8%
90
Natural hazard8%
53
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
38
Construction cost3%
79
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in SHELBY, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN125098 - UNKNOWN125100)
SiteTypeVoltageCapacityQueue waitScore
GWYNNEVILLESubstation-Adjacent345 kV600 MW3.0 yrs71.8
HANNASubstation-Adjacent345 kV600 MW3.0 yrs68.0
TAP138337Substation-Adjacent138 kV100 MW3.0 yrs66.7
Greenfield (JEFFERSON - GREENTOWN)Greenfield765 kV1,000 MW3.0 yrs66.6
UNKNOWN125087Substation-Adjacent138 kV100 MW3.0 yrs66.4
Greenfield (JEFFERSON - GREENTOWN)Greenfield765 kV1,000 MW3.0 yrs66.2
UNKNOWN125092Substation-Adjacent138 kV100 MW3.0 yrs65.3
Greenfield (UNKNOWN125086 - COLUMBUS (345K)Greenfield345 kV600 MW3.0 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN125098 - UNKNOWN125100), SHELBY. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.