Greenfield (UNKNOWN125387 - UNKNOWN125587)

Greenfield

HARRISON, Indiana · PJM

DC Readiness
49.0
Fair / 100

Greenfield (UNKNOWN125387 - UNKNOWN125587) is a greenfield datacenter candidate site in HARRISON, Indiana, interconnecting through PJM. It screens at 49.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN125387
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPHeyburn Building
IXP distance18.3 mi
Fiber providers2
Fiber coverage17.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance201.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerDUKE ENERGY INDIANA INC
Land owner typeprivate
Buildability50.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyPresent
Superfund siteHARRICO LDFL CO INC
Hazard sub-score38/100
Construction cost index60.6 (avg 100)

Location context

Nearest datacenterHeyburn Building
DC distance18.3 mi
Nearest rail1.5 mi
Nearest gas pipeline19.1 mi
Nearest fiber route100.3 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.07¢/kWh
Industrial electricity10.17¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,877

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
35
Fiber connectivity12%
19
Energy cost10%
83
Water risk8%
90
Natural hazard8%
38
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
61
Construction cost3%
100
Gas pipeline2%
39
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in HARRISON, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN125387 - UNKNOWN125587)
SiteTypeVoltageCapacityQueue waitScore
TAP139013Substation-Adjacent345 kV600 MW3.0 yrs72.9
HE RAMSEYSubstation-Adjacent345 kV600 MW3.0 yrs69.1
EC Coal Harrison CountyGreenfield3.0 yrs55.6
SCHMIDT CABINET CO., INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing51.6
CHILD CRAFT INDUSTRIES, INC. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing51.6
TYSON FOODS, INC. (POULTRY PROCESSING)Manufacturing51.5
ICON METAL FORMING, LLC (METAL STAMPING)Manufacturing51.4
LUCAS OIL PRODUCTS, INC. (NOT AVAILABLE)Manufacturing51.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN125387 - UNKNOWN125587), HARRISON. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.