Greenfield (GREENTOWN - DUMONT)

Greenfield

FULTON, Indiana · PJM

DC Readiness
61.2
Good / 100

Greenfield (GREENTOWN - DUMONT) is a greenfield datacenter candidate site in FULTON, Indiana, interconnecting through PJM. It screens at 61.2/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationGREENTOWN
Substation voltage765 kV
Available capacity1,000 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPAunalytics South Bend Datacenter (AUSB)
IXP distance38.2 mi
Fiber providers6
Fiber coverage99.7%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance91.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerNORTHERN INDIANA PUB SERV CO
Land owner typeprivate
Buildability25.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score43/100
Construction cost index83.6 (avg 100)

Location context

Nearest datacenterAunalytics South Bend Datacenter (AUSB)
DC distance38.2 mi
Nearest rail1.3 mi
Nearest gas pipeline18.8 mi
Nearest fiber route81.5 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.24¢/kWh
Industrial electricity8.17¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,558

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
35
Fiber connectivity12%
73
Energy cost10%
84
Water risk8%
90
Natural hazard8%
43
Buildability7%
25
Labor market4%
50
DC cluster4%
50
Land / acreage3%
43
Construction cost3%
80
Gas pipeline2%
40
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in FULTON, ranked by DC Readiness.

Sites near Greenfield (GREENTOWN - DUMONT)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (GREENTOWN - DUMONT)Greenfield765 kV1,000 MW3.0 yrs64.7
Greenfield (DEEDSVILLE 345KV - LEESBURG)Greenfield345 kV600 MW3.0 yrs62.7
Greenfield (UNKNOWN122874 - DEEDSVILLE 345)Greenfield345 kV600 MW3.0 yrs62.0
Greenfield (GREENTOWN - DUMONT)Greenfield765 kV1,000 MW3.0 yrs60.5
ROCHESTER MEDICAL IMPLANTS, LLC (SURGICAL APPLIANCE AND SUPPLIES MANUFACTURING)Manufacturing49.1
BRAUN SEATING, INC. (MOTOR VEHICLE SEATING AND INTERIOR TRIM MANUFACTURING)Manufacturing49.1
BURNS CONSTRUCTION CORP. (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing49.1
MANUFACTURED STRUCTURES CORP. (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing49.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (GREENTOWN - DUMONT), FULTON. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.