Greenfield (DEEDSVILLE 345KV - LEESBURG)

Greenfield

FULTON, Indiana · PJM

DC Readiness
62.7
Good / 100

Greenfield (DEEDSVILLE 345KV - LEESBURG) is a greenfield datacenter candidate site in FULTON, Indiana, interconnecting through PJM. It screens at 62.7/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationDEEDSVILLE 345KV
Substation voltage345 kV
Available capacity600 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPAunalytics South Bend Datacenter (AUSB)
IXP distance41.2 mi
Fiber providers6
Fiber coverage99.7%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance99.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerDUKE ENERGY INDIANA, LLC
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score68/100
Construction cost index83.6 (avg 100)

Location context

Nearest datacenterLigonier CO
DC distance34.3 mi
Nearest rail5.1 mi
Nearest gas pipeline24.7 mi
Nearest fiber route71.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.24¢/kWh
Industrial electricity8.17¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,558

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
35
Fiber connectivity12%
71
Energy cost10%
84
Water risk8%
90
Natural hazard8%
68
Buildability7%
65
Labor market4%
50
DC cluster4%
45
Land / acreage3%
43
Construction cost3%
80
Gas pipeline2%
20
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in FULTON, ranked by DC Readiness.

Sites near Greenfield (DEEDSVILLE 345KV - LEESBURG)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (GREENTOWN - DUMONT)Greenfield765 kV1,000 MW3.0 yrs64.7
Greenfield (UNKNOWN122874 - DEEDSVILLE 345)Greenfield345 kV600 MW3.0 yrs62.0
Greenfield (GREENTOWN - DUMONT)Greenfield765 kV1,000 MW3.0 yrs61.2
Greenfield (GREENTOWN - DUMONT)Greenfield765 kV1,000 MW3.0 yrs60.5
ROCHESTER MEDICAL IMPLANTS, LLC (SURGICAL APPLIANCE AND SUPPLIES MANUFACTURING)Manufacturing49.1
BRAUN SEATING, INC. (MOTOR VEHICLE SEATING AND INTERIOR TRIM MANUFACTURING)Manufacturing49.1
BURNS CONSTRUCTION CORP. (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing49.1
MANUFACTURED STRUCTURES CORP. (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing49.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.