Greenfield (BRIDGE - UNKNOWN202591)

Greenfield

Cassia County, Idaho · WECC

DC Readiness
53.4
Fair / 100

Greenfield (BRIDGE - UNKNOWN202591) is a greenfield datacenter candidate site in Cassia County, Idaho, interconnecting through WECC. It screens at 53.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBRIDGE
Substation voltage138 kV
Available capacity100 MW
Utility commercial rate0.07¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPLowest Host/Empire Technology
IXP distance120.9 mi
Fiber providers11
Fiber coverage66.3%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance124.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerRAFT RIVER RURAL ELEC COOP INC
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone D
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index68.5 (avg 100)

Location context

Nearest datacenterLowest Host/Empire Technology
DC distance120.9 mi
Nearest rail2.4 mi
Nearest gas pipeline22.2 mi
Nearest fiber route48.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity7.43¢/kWh
Industrial electricity6.73¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$4,486

Incentive detail: Personal property tax exemption on computer equipment.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
33
Fiber connectivity12%
45
Energy cost10%
96
Water risk8%
49
Natural hazard8%
85
Buildability7%
70
Labor market4%
50
DC cluster4%
25
Land / acreage3%
48
Construction cost3%
93
Gas pipeline2%
29
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Cassia County, ranked by DC Readiness.

Sites near Greenfield (BRIDGE - UNKNOWN202591)
SiteTypeVoltageCapacityQueue waitScore
WEST BURLEYSubstation-Adjacent138 kV100 MW2.0 yrs67.4
RIVERTONSubstation-Adjacent138 kV100 MW2.0 yrs67.0
PACIFICSubstation-Adjacent138 kV100 MW2.0 yrs66.9
TAP206887Substation-Adjacent115 kV100 MW2.0 yrs66.7
TAP206873Substation-Adjacent115 kV100 MW2.0 yrs66.3
TAP206871Substation-Adjacent115 kV100 MW2.0 yrs65.8
TAP204829Substation-Adjacent115 kV100 MW2.0 yrs65.1
EAST HILLSSubstation-Adjacent138 kV100 MW2.0 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (BRIDGE - UNKNOWN202591), Cassia County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.