Greenfield (WEST MCINTOSH - UNKNOWN155812)

Greenfield

Screven County, Georgia · SERC

DC Readiness
66.8
Good / 100

Greenfield (WEST MCINTOSH - UNKNOWN155812) is a greenfield datacenter candidate site in Screven County, Georgia, interconnecting through SERC. It screens at 66.8/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWEST MCINTOSH
Substation voltage500 kV
Available capacity1,000 MW
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPCogent Fairfax
IXP distance19.3 mi
Fiber providers4
Fiber coverage100.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance91.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerGEORGIA POWER CO
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)1.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index62.0 (avg 100)

Location context

Nearest datacenterCogent Fairfax
DC distance19.3 mi
Nearest rail8.6 mi
Nearest gas pipeline13.1 mi
Nearest fiber route133.7 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.99¢/kWh
Industrial electricity11.53¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$2,834

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
68
Fiber connectivity12%
78
Energy cost10%
91
Water risk8%
80
Natural hazard8%
45
Buildability7%
15
Labor market4%
50
DC cluster4%
70
Land / acreage3%
51
Construction cost3%
98
Gas pipeline2%
58
Tax incentive2%
100
Climate / cooling2%
15

Nearby comparable sites

Other scored datacenter candidate sites in Screven County, ranked by DC Readiness.

Sites near Greenfield (WEST MCINTOSH - UNKNOWN155812)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (WEST MCINTOSH - UNKNOWN155812)Greenfield500 kV1,000 MW3.7 yrs72.5
UNKNOWN112376Substation-Adjacent115 kV100 MW3.7 yrs71.2
Greenfield (WEST MCINTOSH - UNKNOWN155812)Greenfield500 kV1,000 MW3.7 yrs69.0
Greenfield (WEST MCINTOSH - UNKNOWN155812)Greenfield500 kV1,000 MW3.7 yrs68.8
TAP155700Substation-Adjacent115 kV100 MW3.7 yrs67.7
Greenfield (WEST MCINTOSH - UNKNOWN155812)Greenfield500 kV1,000 MW3.7 yrs66.6
UNKNOWN155699Substation-Adjacent115 kV100 MW3.7 yrs65.8
UNKNOWN116831Substation-Adjacent115 kV100 MW3.7 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (WEST MCINTOSH - UNKNOWN155812), Screven County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.