Greenfield (UNKNOWN111236 - SOUTH HALL)

Greenfield

Hall County, Georgia · PJM

DC Readiness
54.1
Fair / 100

Greenfield (UNKNOWN111236 - SOUTH HALL) is a greenfield datacenter candidate site in Hall County, Georgia, interconnecting through PJM. It screens at 54.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN111236
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXPQTS Atlanta-Suwanee (SUW1)
IXP distance24.7 mi
Fiber providers10
Fiber coverage62.5%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance225.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerGEORGIA POWER CO
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)1.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score60/100
Construction cost index90.5 (avg 100)

Location context

Nearest datacenterQTS Suwanee Data Center 2
DC distance24.5 mi
Nearest rail4.5 mi
Nearest gas pipeline21.3 mi
Nearest fiber route51.4 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.55¢/kWh
Industrial electricity7.83¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$13,855

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
35
Fiber connectivity12%
28
Energy cost10%
82
Water risk8%
79
Natural hazard8%
60
Buildability7%
80
Labor market4%
50
DC cluster4%
60
Land / acreage3%
32
Construction cost3%
75
Gas pipeline2%
31
Tax incentive2%
100
Climate / cooling2%
15

Nearby comparable sites

Other scored datacenter candidate sites in Hall County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN111236 - SOUTH HALL)
SiteTypeVoltageCapacityQueue waitScore
SOUTH HALLSubstation-Adjacent500 kV1,000 MW4.3 yrs71.6
UNKNOWN111235Substation-Adjacent230 kV300 MW4.3 yrs68.4
Greenfield (UNKNOWN110410 - SOUTH HALL)Greenfield500 kV1,000 MW4.3 yrs67.0
UNKNOWN111191Substation-Adjacent230 kV300 MW4.3 yrs66.5
UNKNOWN111231Substation-Adjacent230 kV300 MW4.3 yrs65.4
UNKNOWN111499Substation-Adjacent230 kV300 MW4.3 yrs64.9
Greenfield (UNKNOWN110410 - SOUTH HALL)Greenfield500 kV1,000 MW4.3 yrs63.8
UNKNOWN173837Substation-Adjacent115 kV100 MW4.3 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN111236 - SOUTH HALL), Hall County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.