EC Coal District of Columbia

Greenfield

District of Columbia, District of Columbia · PJM

DC Readiness
66.6
Good / 100

EC Coal District of Columbia is a greenfield datacenter candidate site in District of Columbia, District of Columbia, interconnecting through PJM. It screens at 66.6/100 DC Readiness and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_PEPCO
Wholesale LMP$47.47/MWh
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.1 yrs
Recent queue wait2.9 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPAiNET DC-900S
IXP distance4.3 mi
Fiber providers15
Fiber coverage92.6%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance28.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerPOTOMAC ELECTRIC POWER CO
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usecoal adjacent

Risk & environment

Flood zoneZone X
Water stress (WRI)1.00
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index115.1 (avg 100)

Location context

Nearest datacenterAiNET DC-900S
DC distance4.3 mi
Nearest rail0.8 mi
Nearest gas pipeline13.6 mi
Nearest fiber route1.8 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (tax_credits)
Commercial electricity13.52¢/kWh
Industrial electricity1.89¢/kWh
Cooling degree days1,500
Heating degree days4,200

Incentive detail: Technology sector tax incentives; Qualified High Technology Company (QHTC) credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
57
Fiber connectivity12%
95
Energy cost10%
76
Water risk8%
87
Natural hazard8%
78
Buildability7%
100
Labor market4%
50
DC cluster4%
95
Land / acreage3%
43
Construction cost3%
54
Gas pipeline2%
56
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in District of Columbia, ranked by DC Readiness.

Sites near EC Coal District of Columbia
SiteTypeVoltageCapacityQueue waitScore
BUZZARD POINTSubstation-Adjacent230 kV300 MW3.1 yrs75.5
TOKOMASubstation-Adjacent230 kV300 MW3.1 yrs74.7
BENNING (230KV)Substation-Adjacent230 kV300 MW3.1 yrs74.5
O STSubstation-Adjacent138 kV100 MW3.1 yrs72.0
ALABAMA AVENUESubstation-Adjacent230 kV300 MW3.1 yrs71.7
METZEROTT ROADSubstation-Adjacent230 kV300 MW3.1 yrs71.5
BENNING (69KV)Substation-Adjacent115 kV100 MW3.1 yrs71.4
BLADENSBURGSubstation-Adjacent115 kV100 MW3.1 yrs71.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.